Slit construction - List of Manufacturers, Suppliers, Companies and Products

Slit construction Product List

1~2 item / All 2 items

Displayed results

Post-construction slit work "Non-Pick Method" Construction Photo Collection Giveaway!

[Construction Photo Collection Giveaway] Equivalent seismic reinforcement effect to complete slits! Introducing construction examples in condominiums.

The "Non-Pick Method" is a post-construction slitting process that allows for continuous and consistent construction from end drilling to groove cutting with a dedicated cutting machine (equipped with a special bit) in a single setup. It is a groundbreaking method that requires no chipping, produces low vibration and low noise, and generates minimal waste with excellent precision. This photo collection of the construction showcases examples of the "Non-Pick Method" used in a certain apartment building in Tokyo. It can be utilized as a partial slitting method that allows construction to be carried out while residents are living in the building, achieving seismic effects equivalent to those of complete slitting. We encourage you to take a look at this opportunity. 【Main Features】 ■ Continuous and consistent cutting can be achieved with a single setup of the dedicated cutting machine ■ The precision and finish of the slits are outstanding ■ Dust-free construction with low vibration and low noise, requiring no chipping ■ Drilling and cutting debris is in a slurry form (liquid mixed with sand particles), making disposal easy For more details, please contact us or download the catalog.

  • Reinforcement and repair materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Post-construction slit work "Noise measurement of cutting machines associated with seismic reinforcement work"

It is necessary to understand the characteristics of noise generated by the construction method.

In seismic reinforcement work for buildings, slits are constructed on the exterior walls. There are two methods for the slit construction: the conventional wall saw cutter and chipping method, and a dedicated cutting machine using special bits. In either method, noise is generated during cutting, so it is necessary to understand the characteristics of the noise produced by the method in order to preserve the surrounding environment during construction. 【Measurement Results of Maximum Noise Levels】 [Method: Renewal Slit Method, Cutting Method: Chipping] ○ Indoor Average: 102 (101) dB ○ Outdoor 5m: 95 (90) dB ○ Outdoor 7m: 83 (80) dB ○ Outdoor 30m: 70 (68) dB For more details, please contact us or download the catalog.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration